Bishops Castle town centre - phase 3

Proceed with selected recommendations from the network efficiency report.

SY9 5BG

Stages

Route study report
Autumn 2023
Design
Spring 2024
Construction
Spring 2024 Spring 2025

Status

Route study report
Completed
Design
Pending
Construction
Pending

Please note that the 'construction' timeframe under 'Stages' above is merely notional for the time being as the programme of work has yet to be published by our contractor. 

Description

Proceed with selected recommendations from the network efficiency report. Actions include consulting with local community regarding the possible introduction of a one-way system throughout the U6979 Church Street / High Street; 20mph speed limit within the town centre; tighten the junction radius of U6177 Salop Street.

Location

  • U6979 Church Street / High Street, Bishop’s Castle, grid ref. 332353, 288781. What3words Ref: ///ranks.overheard.scorecard
  • U6177 Salop Street / B4385 Station Road, Bishop’s Castle, grid ref 332474, 288960. What3words Ref: ///look.unspoiled.starting

On target?

Pending.

Map

Please note that construction work undertaken can often cover an area rather than one specific place, so the pin on the map on this page is intended as a guide only.

Correspondence history

All relevant correspondence relating to this piece of work will be included here:

None to date.

Contact

Please contact cilproject@shropshire.gov.uk with any comments or queries.

Please note that all queries the teams receive along with the responses will be uploaded onto the portal to provide updated information for everyone. Please don't include any personal or sensitive information as this will need to be redacted.

Additional Information

Area
South Shropshire