Please note that the 'construction' timeframe under 'Stages' above is merely notional for the time being as the programme of work has yet to be published by our contractor.
Description
The scheme aims to deliver the following elements on Oteley Road:
Phase 1
- Review and consolidation of existing signs and road markings
- Extend the 30mph limit throughout the extent of Oteley Road
- Provision of appropriate controlled crossing
Phase 2
- Providing a continuous footway along the southern side of the carriageway from Weeping Cross roundabout to the junction with Maxfield Drive
- Regrading of ramps to raised plateaus
Phase 3
- Feasibility report relating to opportunities at the junction of Oteley Road and Sutton Road
- Potential removal of two filter lanes adjacent to Sutton Road
Update: trial hole investigation required for the benefit of new footway construction.
Location
Oteley Road, Shrewsbury. Grid ref: 349219, 310629 – 351248, 310411
What3words Ref: ///rungs.snaps.strong - ///tops.grid.winter
On target?
Yes.
Map
Please note that construction work undertaken can often cover an area rather than one specific place, so the pin on the map on this page is intended as a guide only.
Correspondence history
All relevant correspondence relating to this piece of work will be included here:
6 June 2024
Further to our discussions regarding the progress on the B480 Oteley Road project, I would ask you to review the following email detailing those highlighted key risks, proposed mitigatory actions, and the potential impact on the programme which can be used to provide within the council.
Phase 1
The following components are due to conclude.
- Signalised Crossings
As you will be aware, following the conclusion of WSP’s designs, it is anticipated that the additional crossing facility situated adjacent to the stadium will be constructed late-June 2024, in accordance with the contractor’s programme (subject to approvals).
- 30mph Speed Limit
Following the conclusion of the recent public consultation on the proposed 30mph speed limit throughout B480 Oteley Road and selected lengths of neighbouring roads, you will be aware that out of a total of 30 correspondences received via the formal channels detailed on the public notice regarding the proposals, five have been deemed and formally acknowledged as ‘objections’ to the proposals. In addition to these five objections, you will also acknowledge that the police have also communicated their position on this project. Due to the objections received, WSP has prepared an Implementation Approval (“Objection”) Report for your consideration before escalating it to the attention of those Shropshire Council Officers with designated authority to decide whether or not to proceed.
Phase 2
Despite significant progress with key components of Phase 2, including the Raised Tables and that additional signalised crossing between Sutton Drive and Maxwell Drive, there have been delays due to existing site constraints and mitigatory actions to overcome these, particularly with regards to the utilities. Initial conversations with the relevant statutory owners, BT Openreach & Virginmedia, to re-direct their services have progressed in line with the NRSWA C3. The process has concluded with an impasse with Virginmedia due to disagreements with their estimated costs (£75,000 compared to a £7,500 cost from BT Openreach). At present, WSP are now in the process of making arrangements to undertake trial pits to determine utility location and depths to mitigate the risk posed by Virgin Media; if the services are found to be at an insufficient depth we will address the issue direct with the owner. The impact on programme is still be ascertained.
For information, assessment is still underway regards improvement to the Sutton Road junction; a concept design for a roundabout is in development following positive outputs for this solution from a transport assessment.
Thanks
Pete
Peter Timson
Group Director Roads Midlands
Associate Director
CEng MICE
Contact
Please contact s106projects@shropshire.gov.uk with any comments or queries.
Please note that all queries the teams receive along with the responses will be uploaded onto the portal to provide updated information for everyone. Please don't include any personal or sensitive information as this will need to be redacted.