CIL schemes
CIL schemes
- Project
- Battlefield Road/Arlington Way/Tesco Shrewsbury
- Location
- SY1 4HA
- Summary
Design and installation of upgraded traffic signals.
- Area
- Shrewsbury
- Status
-
- Design
- Completed
- Construction
- Completed
- Project
- Knockin signalised crossing
- Location
- SY10 8HJ
- Summary
Provision of new puffin crossing with associated street lighting.
- Area
- North Shropshire
- Status
-
- Design
- Completed
- Construction
- Completed
- Project
- Welshampton pedestrian crossing
- Location
- SY12 0PJ
- Summary
Provision of new zebra crossing with associated street lighting.
- Area
- North Shropshire
- Status
-
- Design
- In progress
- Construction
- Pending
- Project
- Bank Farm VAS, Shrewsbury
- Location
- SY3 6DD
- Summary
Design and installation of five new VAS (vehicle-activated signs).
- Area
- Shrewsbury
- Status
-
- Design
- Completed
- Construction
- Completed
- Project
- Highley pedestrian crossing
- Location
- WV16 6DE
- Summary
Provision of new puffin crossing.
- Area
- South Shropshire
- Status
-
- Design
- Completed
- Construction
- Completed
- Project
- Stan's Roundabout, Oswestry
- Location
- SY11 3AS
- Summary
This scheme seeks to improve safety concerns at Stan’s Roundabout in St Martin’s.
- Area
- North Shropshire
- Status
-
- Design
- Completed
- Construction
- Completed
- Project
- Clee Hill to Doddington speed limit extension
- Location
- DY14 0HQ
- Summary
Design and implement a road safety project.
- Area
- South Shropshire
- Status
-
- Design
- Completed
- Construction
- Awaiting contractor programme
- Project
- Cleobury Mortimer Medical Practice footway and crossing
- Location
- DY14 8DX
- Summary
Provision of a footway extension and crossing facility.
- Area
- South Shropshire
- Status
-
- Design
- Pending
- Construction
- Pending
- Project
- Pontesbury Junction improvements
- Location
- SY5 0RR
- Summary
Proposals seek to improve pedestrian movements.
- Area
- Central Shropshire
- Status
-
- Design
- Completed
- Construction
- Pending
- Project
- Bishops Castle town centre - phase 1
- Location
- SY9 5BG
- Summary
Provision of a route study report to improve the highway.
- Area
- South Shropshire
- Status
-
- Route study report
- Completed
- Design
- Pending
- Construction
- Pending
- Project
- Bishops Castle town centre - phase 2
- Location
- SY9 5BG
- Summary
Proceed with selected recommendations from the network efficiency report.
- Area
- South Shropshire
- Status
-
- Route study report
- Completed
- Design
- Completed
- Construction
- Pending
- Project
- Bishops Castle town centre - phase 3
- Location
- SY9 5BG
- Summary
Proceed with selected recommendations from the network efficiency report.
- Area
- South Shropshire
- Status
-
- Route study report
- Completed
- Design
- Pending
- Construction
- Pending
- Project
- Ruyton XI Towns CiL works
- Location
- SY4 1LB
- Summary
The projects seeks to improve streetscape and both pedestrian and road safety.
- Area
- Central Shropshire
- Status
-
- Design
- In progress
- Construction
- Pending
- Project
- SITP routes - Pritchard's Way, Shrewsbury
- Location
- SY3 7TZ
- Summary
The scheme aims to improve the pedestrian and cyclist connectivity.
- Area
- Shrewsbury
- Status
-
- Design
- In progress
- Construction
- Pending
- Project
- SITP routes - Underdale to Castle Walk Bridge
- Location
- SY2 5DH
- Summary
Scheme seeks to upgrade existing cycle and pedestrian infrastructure.
- Area
- Shrewsbury
- Status
-
- Design
- Completed
- Construction
- Awaiting contractor programme
- Project
- Cross Houses to Atcham improvements
- Location
- SY5 6JJ
- Summary
The scheme aims to design and implement a package of highway intervention works.
- Area
- Central Shropshire
- Status
-
- Design
- In progress
- Construction
- Pending
- Project
- Mytton Estate, Shawbury
- Location
- SY4 4NZ
- Summary
The scope of this scheme is to design and implement a road safety improvement scheme.
- Area
- Central Shropshire
- Status
-
- Design
- Completed
- Construction
- Pending
- Project
- A458 pedestrian crossing, Much Wenlock
- Location
- TF13 6FD
- Summary
This scheme provides a pedestrian crossing on the A488 Much Wenlock.
- Area
- Central Shropshire
- Status
-
- Design
- Completed
- Construction
- In progress
- Project
- Haughmond Federation development
- Location
- SY1 4QN
- Summary
The scheme aims to design and implement a new school access.
- Area
- Shrewsbury
- Status
-
- Design
- In progress
- Construction
- Pending
- Project
- Minsterley footway
- Location
- SY5 0BH
- Summary
The scheme aims to investigate, design and implement measures to improve pedestrian accessibility and connectivity.
- Area
- Central Shropshire
- Status
-
- Design
- In progress
- Construction
- Pending
- Project
- Forton Heath speed limit extension
- Location
- SY4 1EZ
- Summary
The scheme aims to design and implement a road safety project throughout the village.
- Area
- Central Shropshire
- Status
-
- Design
- In progress
- Construction
- Awaiting contractor programme
- Project
- Wenlock Rise, Bridgnorth
- Location
- WV16 5PF
- Summary
The proposals include provision of additional car parking and double yellow lines.
- Area
- South Shropshire
- Status
-
- Design
- In progress
- Construction
- Pending
- Project
- High St, Shrewsbury
- Location
- SY1 1ST
- Summary
Town centre improvements to boost the local economy.
- Area
- Shrewsbury
- Status
-
- Design
- In progress
- Construction
- Pending
- Project
- The Coppice / Clayton Way Footway, Shrewsbury
- Location
- SY3 5DD
- Summary
The scheme aims to provide a new connecting footway.
- Area
- Shrewsbury
- Status
-
- Design
- In progress
- Construction
- Pending
- Project
- Coed-y-Go speed limit extension
- Location
- SY10 9AU
- Summary
The scheme aims to provide measures to improve road safety.
Consultation period ended on 26 January 2024 with no objections.
- Area
- North Shropshire
- Status
-
- Design
- Completed
- Construction
- Awaiting contractor programme
- Project
- Lower Hordley traffic calming
- Location
- SY12 9BG
- Summary
The scheme aims to reduce speed through the village.
- Area
- North Shropshire
- Status
-
- Design
- Pending
- Construction
- Pending
- Project
- Whitchurch Future Transport and Movement Strategy
- Location
- SY13 1AZ
- Summary
The scope of The Whitchurch Future Transport and Movement Plan.
- Area
- North Shropshire
- Status
- Pending
- Project
- Ludlow Future Transport and Movement Strategy
- Location
- SY8 1BS
- Summary
The scope of the Ludlow Future Transport and Movement Plan.
- Area
- South Shropshire
- Status
- Pending
- Project
- Shrewsbury Parking Strategy
- Location
- SY1 2AD
- Summary
Development of a parking strategy that aligns with the Big Town Plan's wider objectives.
- Area
- Shrewsbury
- Status
- Pending
- Project
- Escob Bridge, St Martins
- Location
- SY10 7AZ
- Summary
Investigation into the feasibility of installing permanent signals to improve safety at this point.
- Area
- North Shropshire
- Status
-
- Design
- Pending
- Construction
- Pending
- Project
- St Martins School parking scheme
- Location
- SY10 7BG
- Summary
Investigate and design measures to prohibit parking to improve road safety and ease congestion.
- Area
- North Shropshire
- Status
-
- Design
- Pending
- Construction
- Pending
- Project
- Neen Savage drainage interventions
- Location
- DY14 8JU
- Summary
The scheme aims to reduce flooding impact at Neen Savage by de-culverting the highway ditch and provision of screen upstream, along with provision of additional signs to provide advance warning of the crossing.
- Area
- Status
-
- Design
- In progress
- Construction
- Pending