CIL schemes

CIL schemes

Project
Battlefield Road/Arlington Way/Tesco Shrewsbury
Location
SY1 4HA
Summary

Design and installation of upgraded traffic signals.

Area
Shrewsbury
Status
Design
Completed
Construction
Completed
Project
Knockin signalised crossing
Location
SY10 8HJ
Summary

Provision of new puffin crossing with associated street lighting.

Area
North Shropshire
Status
Design
Completed
Construction
Completed
Project
Welshampton pedestrian crossing
Location
SY12 0PJ
Summary

Provision of new zebra crossing with associated street lighting.

Area
North Shropshire
Status
Design
In progress
Construction
Pending
Project
Bank Farm VAS, Shrewsbury
Location
SY3 6DD
Summary

Design and installation of five new VAS (vehicle-activated signs).

Area
Shrewsbury
Status
Design
Completed
Construction
Completed
Project
Highley pedestrian crossing
Location
WV16 6DE
Summary

Provision of new puffin crossing.

Area
South Shropshire
Status
Design
Completed
Construction
Completed
Project
Stan's Roundabout, Oswestry
Location
SY11 3AS
Summary

This scheme seeks to improve safety concerns at Stan’s Roundabout in St Martin’s.

Area
North Shropshire
Status
Design
Completed
Construction
Completed
Project
Clee Hill to Doddington speed limit extension
Location
DY14 0HQ
Summary

Design and implement a road safety project.

Area
South Shropshire
Status
Design
Completed
Construction
Awaiting contractor programme
Project
Cleobury Mortimer Medical Practice footway and crossing
Location
DY14 8DX
Summary

Provision of a footway extension and crossing facility.

Area
South Shropshire
Status
Design
Pending
Construction
Pending
Project
Pontesbury Junction improvements
Location
SY5 0RR
Summary

Proposals seek to improve pedestrian movements.

Area
Central Shropshire
Status
Design
Completed
Construction
Pending
Project
Bishops Castle town centre - phase 1
Location
SY9 5BG
Summary

Provision of a route study report to improve the highway.

Area
South Shropshire
Status
Route study report
Completed
Design
Pending
Construction
Pending
Project
Bishops Castle town centre - phase 2
Location
SY9 5BG
Summary

Proceed with selected recommendations from the network efficiency report.

Area
South Shropshire
Status
Route study report
Completed
Design
Completed
Construction
Pending
Project
Bishops Castle town centre - phase 3
Location
SY9 5BG
Summary

Proceed with selected recommendations from the network efficiency report.

Area
South Shropshire
Status
Route study report
Completed
Design
Pending
Construction
Pending
Project
Ruyton XI Towns CiL works
Location
SY4 1LB
Summary

The projects seeks to improve streetscape and both pedestrian and road safety.

Area
Central Shropshire
Status
Design
In progress
Construction
Pending
Project
SITP routes - Pritchard's Way, Shrewsbury
Location
SY3 7TZ
Summary

The scheme aims to improve the pedestrian and cyclist connectivity.

Area
Shrewsbury
Status
Design
In progress
Construction
Pending
Project
SITP routes - Underdale to Castle Walk Bridge
Location
SY2 5DH
Summary

Scheme seeks to upgrade existing cycle and pedestrian infrastructure.

Area
Shrewsbury
Status
Design
Completed
Construction
Awaiting contractor programme
Project
Cross Houses to Atcham improvements
Location
SY5 6JJ
Summary

The scheme aims to design and implement a package of highway intervention works.

Area
Central Shropshire
Status
Design
In progress
Construction
Pending
Project
Mytton Estate, Shawbury
Location
SY4 4NZ
Summary

The scope of this scheme is to design and implement a road safety improvement scheme.

Area
Central Shropshire
Status
Design
Completed
Construction
Pending
Project
A458 pedestrian crossing, Much Wenlock
Location
TF13 6FD
Summary

This scheme provides a pedestrian crossing on the A488 Much Wenlock.

Area
Central Shropshire
Status
Design
Completed
Construction
In progress
Project
Haughmond Federation development
Location
SY1 4QN
Summary

The scheme aims to design and implement a new school access.

Area
Shrewsbury
Status
Design
In progress
Construction
Pending
Project
Minsterley footway
Location
SY5 0BH
Summary

The scheme aims to investigate, design and implement measures to improve pedestrian accessibility and connectivity.

Area
Central Shropshire
Status
Design
In progress
Construction
Pending
Project
Forton Heath speed limit extension
Location
SY4 1EZ
Summary

The scheme aims to design and implement a road safety project throughout the village.

Area
Central Shropshire
Status
Design
In progress
Construction
Awaiting contractor programme
Project
Wenlock Rise, Bridgnorth
Location
WV16 5PF
Summary

The proposals include provision of additional car parking and double yellow lines.

Area
South Shropshire
Status
Design
In progress
Construction
Pending
Project
High St, Shrewsbury
Location
SY1 1ST
Summary

Town centre improvements to boost the local economy.

Area
Shrewsbury
Status
Design
In progress
Construction
Pending
Project
The Coppice / Clayton Way Footway, Shrewsbury
Location
SY3 5DD
Summary

The scheme aims to provide a new connecting footway.

Area
Shrewsbury
Status
Design
In progress
Construction
Pending
Project
Coed-y-Go speed limit extension
Location
SY10 9AU
Summary

The scheme aims to provide measures to improve road safety.

Consultation period ended on 26 January 2024 with no objections.

Area
North Shropshire
Status
Design
Completed
Construction
Awaiting contractor programme
Project
Lower Hordley traffic calming
Location
SY12 9BG
Summary

The scheme aims to reduce speed through the village.

Area
North Shropshire
Status
Design
Pending
Construction
Pending
Project
Whitchurch Future Transport and Movement Strategy
Location
SY13 1AZ
Summary

The scope of The Whitchurch Future Transport and Movement Plan.

Area
North Shropshire
Status
Pending
Project
Ludlow Future Transport and Movement Strategy
Location
SY8 1BS
Summary

The scope of the Ludlow Future Transport and Movement Plan.

Area
South Shropshire
Status
Pending
Project
Shrewsbury Parking Strategy
Location
SY1 2AD
Summary

Development of a parking strategy that aligns with the Big Town Plan's wider objectives.

Area
Shrewsbury
Status
Pending
Project
Escob Bridge, St Martins
Location
SY10 7AZ
Summary

Investigation into the feasibility of installing permanent signals to improve safety at this point. 

Area
North Shropshire
Status
Design
Pending
Construction
Pending
Project
St Martins School parking scheme
Location
SY10 7BG
Summary

Investigate and design measures to prohibit parking to improve road safety and ease congestion.

Area
North Shropshire
Status
Design
Pending
Construction
Pending
Project
Neen Savage drainage interventions
Location
DY14 8JU
Summary

The scheme aims to reduce flooding impact at Neen Savage by de-culverting the highway ditch and provision of screen upstream, along with provision of additional signs to provide advance warning of the crossing.

Area
Status
Design
In progress
Construction
Pending